Installation Restoration Program (IRP) Stage 3. Finding of No Significant Impact Operable Unit B. Engineering Evaluation/Cost Analysis-Environmental Assessment and Removal Action
Author | : RADIAN CORP SACRAMENTO CA. |
Publisher | : |
Total Pages | : 6 |
Release | : 1991 |
ISBN-10 | : OCLC:227768470 |
ISBN-13 | : |
Rating | : 4/5 ( Downloads) |
Download or read book Installation Restoration Program (IRP) Stage 3. Finding of No Significant Impact Operable Unit B. Engineering Evaluation/Cost Analysis-Environmental Assessment and Removal Action written by RADIAN CORP SACRAMENTO CA. and published by . This book was released on 1991 with total page 6 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Department of the Air Force has prepared an Engineering Evaluation/Cost Analysis and assessment of environmental impact to respond to contaminated ground water in Operable Unit (OU) B at McClellan AFB, California. Proposed action involves: (1) installation of extraction wells; (2) extraction of contaminated ground water; (3) treatment of extracted groundwater; and (4) release of the treated groundwater. Additional ground water monitoring, abandonment of a contaminated production well, continued extraction from a production well, and restriction on the use of a third production well are also proposed as integral parts of the restoration and water reclamation activity. This action only covers short-term measures to reduce the potential for increased health risks from the migration of higher concentrations of contaminants to on- and off-base water supply wells.