Project Specific Quality Assurance Plan Project W-058 Replacement Cross-site Transfer System

Project Specific Quality Assurance Plan Project W-058 Replacement Cross-site Transfer System
Author :
Publisher :
Total Pages : 15
Release :
ISBN-10 : OCLC:68418615
ISBN-13 :
Rating : 4/5 ( Downloads)

Book Synopsis Project Specific Quality Assurance Plan Project W-058 Replacement Cross-site Transfer System by :

Download or read book Project Specific Quality Assurance Plan Project W-058 Replacement Cross-site Transfer System written by and published by . This book was released on 1996 with total page 15 pages. Available in PDF, EPUB and Kindle. Book excerpt: This is part of the Tank Waste Projects (TWP) Quality Assurance Program Plan. This document and the Tank Waste Projects QAPP describe the program and the planned actions which WHC will implement, demonstrate and ensure that the project meets the requirements of 10 CFR 830.120. Purpose of Project W058, Replacement Cross-Site Transfer System, is to replace the existing cross-site transfer system for transferring waste (via pipeline) in support of the Hanford Site clean-up mission. The transfers will be made from 200 East and 200 West tank farms to treatment, storage, and disposal facilities in the 200 East Area. The new system will consist of a pipe-in-pipe connecting the 241-SY A and B valve pits in the 200 West Area with the 244-A Lift Station in the 200 East Area. The work to be accomplished by W-058 and covered by this QAPP includes diversion box, vent station, piping, booster pump, backup flush system, power lines.


Project Specific Quality Assurance Plan Project W-058 Replacement Cross-site Transfer System Related Books

Project Specific Quality Assurance Plan Project W-058 Replacement Cross-site Transfer System
Language: en
Pages: 15
Authors:
Categories:
Type: BOOK - Published: 1996 - Publisher:

DOWNLOAD EBOOK

This is part of the Tank Waste Projects (TWP) Quality Assurance Program Plan. This document and the Tank Waste Projects QAPP describe the program and the planne
Baseline Comparison Report for Project W-058, Replacement of the Cross-site Transfer System
Language: en
Pages: 32
Authors:
Categories:
Type: BOOK - Published: 1996 - Publisher:

DOWNLOAD EBOOK

This BCR compares the Project W-058 Functional Design Criteria with the Project W-058 Preliminary Design Requirements Document, and identifies the differences b
The Office of Environmental Management Technical Reports
Language: en
Pages: 972
Authors:
Categories: Environmental management
Type: BOOK - Published: 1997 - Publisher:

DOWNLOAD EBOOK

Replacement Cross-site Transfer System Project W-058 Safety Class Upgrade Summary Report
Language: en
Pages: 19
Authors:
Categories:
Type: BOOK - Published: 1998 - Publisher:

DOWNLOAD EBOOK

This report evaluates the design of the replacement cross-site transfer system structures, systems, and components for safety related applications as defined in
Baseline Comparison Report for Project W-058, Replacement of the Cross-site Transfer System. Revision 1
Language: en
Pages: 33
Authors:
Categories:
Type: BOOK - Published: 1995 - Publisher:

DOWNLOAD EBOOK

This BCR compares the Project W-058 Functional Design Criteria with the Project W-058 Preliminary Design Requirements Document, and identifies the differences b